Customer Profile
The implementation of the new IT infrastructure has brought significant improvements in the performance and security of our operations. Thanks to advanced virtualization, we are assured of high availability and flexibility for future growth, which helps us respond quickly to changes in our production and adapt to our customers' needs. In a word, the collaboration with our vendor Aricoma has been great. The team was always ready to provide expert support, effectively addressing all our requirements, both in the design of the solution and during the actual implementation. The entire upgrade project went smoothly despite minor logistical challenges, which confirmed to us the quality and professionalism of both the chosen solution and the choice of supplier.
Initial situation and objectives of the project
At the outset, the customer considered several options, including HPE Simplivity hyperconverged infrastructure, which had already been used successfully at other sites. After carefully evaluating the options, they ultimately decided on a combination of HPE DL380 servers and HPE Alletra MP storage solution, which proved optimal for achieving their desired goals. The customer approached us based on previous positive experiences with our services and consulted with other manufacturing plants that had already successfully deployed similar technologies.
Benefits
- Modern infrastructure under full guarantee, which ensures stability and supports the further development of the company.
- A powerful and scalable solution with the ability to expand disk capacity as needed.
- Cloud-based management for efficient management and monitoring of systems.
- Increased operational reliability through high availability and outage protection.
Solution Description
The server infrastructure is dually connected to two LAN switches, PDUs and SAN switches at each site, ensuring maximum redundancy and reliability of the entire system. The virtual infrastructure is managed by the vCenter Management server, which is deployed as a virtual machine. This solution enables efficient management and performance monitoring across both plants and easily adapts to future capacity expansion requirements.
The implementation took place simultaneously at two sites and was divided into several phases. It was essential to work closely with the customer's IT team to ensure that all steps ran smoothly. During the implementation, we faced limited availability of SAN switches, which caused minor delays. The implementation itself took approximately two weeks of net time per site. After several months of operation, the customer is satisfied with the results - the infrastructure fully meets the performance, stability and flexibility requirements.
Used technologies
- HPE DL380 servers
- HPE Alletra MP disk storage
- HPE SAN switches
- VMware vSphere 8 virtualization, vCenter Management server
DO NOT HESITATE TO
CONTACT US
Are you interested in more information or an offer for your specific situation?
